Monday Dec 23, 2024
Monday Dec 23, 2024

Operation of Mid-Hill Highway blocked by landslide


Nepalnews
RSS
2022 Jul 05, 13:25, Baglung
Image: Map of Baglung/ Google Map

The Baglung-Ghodabandhe section of the Mid-Hills Highway, which was blocked due to a landslide caused by rain, has been re-opened at 10:30 am on Tuesday. The road has been re-opened after removing the fallen stones, soil and trees using an excavator.

The Mid-Hill Highway had been blocked since last night due to landslides. Deputy Superintendent of Police Indra Bahadur Rana said that the road was operated by operating an excavator in collaboration with the Road Division Office and Baglung Municipality on Tuesday morning. The landslide had fallen in a ditch near the border of Baglung Municipality and Kanthekhola Municipality. There were small landslides in various parts of the section. As soon as the road is re-opened, long and short-distance vehicles are moving towards the destination.

Similarly, the Baglung-Kushmishera road connecting the south of the district has also come into operation. The road that was blocked due to landslides has been cleared with the help of Baglung Municipality. The road was blocked due to a landslide in Dablung of Baglung Municipality-10.

READ ALSO:

Baglung-Ghodabandhe section Baglung municipality Baglung-Kushmishera road Latest news of Nepal NepalNews nepal
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
nepalnewseditor@gmail.com

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal