The Prithvi Highway has come back into operation. It remained since last night due to landslides at Ghoptebhir and Thadekhola in Ichchakama-4 of Chitwan.
Two-way traffic had been closed since 11 pm last night, according to the Area Police Office, Muglin. The landslide was removed and two-way traffic resumed from 2.30 am.
Prithvi Highway, the main highway connecting the federal capital Kathmandu, has been repeatedly obstructed due to landslides at Ghoptebhir, located in between Muglin and Kurintar.
READ ALSO: