A new track is being opened to connect Chame with Upper Manang since the roadway connecting Lower Manag with the Upper Manang district has been disrupted due to landslide and flood on May 28 and June 15.
Water has started flowing again in Marshyangdi River after it was blocked due to the debris collected in the river because of the floods and landslides.