The Helambu highway has become operational after two days since it was blocked. The roadway was blocked due to landslide and flood triggered by incessant rain.
The Narayanghat-Mugling road stretch has witnessed traffic disruptions due to a massive landslide that occurred at Setidobhan area at 8.20 pm last night following heavy rain.