Saturday Nov 23, 2024
Saturday Nov 23, 2024

Relief work continues by Nepal Army


Nepalnews
2023 Aug 18, 14:34,

The Nepali Army has continued search and rescue operations in areas affected by floods and landslides. At the same time, the troops deployed in different places of the country have performed various tasks.

Due to the flood in the Kagkhola River in Mustang district, efforts are being made to remove the piled mud from the houses of Kagbeni market located in Baragung Muktikshetra rural municipality-4 and make it habitable.

800 meters of pipe have been installed to bring water to the settlement in order to improve the supply of water in that place. In coordination with the Electricity Authority, the work of burying the electricity pole has been done to facilitate the foreigners and local citizens going to Upper Mustang.

In Sindhupalchok District, Bahrvise Municipality, Sirise, the local residents and their belongings have been helped to move the local residents and their belongings to a safe place in the settlements that are at risk due to the landslide. Coordinated with the road department and helped to operate the road.

Rescue operations are continuing in various parts of the country affected by floods and landslides, while the army has been kept in readiness to deal with sudden disasters.

READ ALSO:

The Nepali Army floods and landslides sudden disasters
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
nepalnewseditor@gmail.com

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal