Monday Dec 23, 2024
Monday Dec 23, 2024

Infrastructure Development Office

Barpak-Laprak Road Section Blocked for 3 Months

Oct 10, 2023
A road section linking Barpak and Laprak of Gorkha has been obstructed for the past three months.

Motorable bridge built over Chilli River

Mar 30, 2022
The work was delayed due to the lockdown.

Sub-standard materials to be removed from drain construction

Feb 3, 2022
In Shuklaphanta Municipality-8, Beldandi, it has been instructed to remove the substandard material used in the construction of road side drain.

Construction of Beni-Darbang road resumed

Sep 13, 2021
The main contractor of the Beni-Darbang road construction has resumed its works after five months.

Entrepreneur exposed for delaying road construction in Myagdi

Jul 20, 2021
A road construction entrepreneur has been exposed by sporting his photo and smearing it with soot for delaying the construction of Beni-Darbang roadway.
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
nepalnewseditor@gmail.com

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal