Two-way traffic resumes on Narayangadh-Muglin road

August 27, 2023
1 MIN READ
A
A+
A-

Two way traffic has resumed on the Narayangadh-Muglin road section that was disrupted due to landslide.

According to Chief of Area Police Office, Chitwan, Bishal Tamang, the two-way road traffic has reopened since 5.40 pm Saturday.

Vehicular movement was partially allowed along the road section after incessant rainfall triggered landslide nearby the Namsi Bridge at Ichhakamana-6 in Chitwan.

According to the Road Division Office Bharatpur, the task of debris removal was initiated since 1.00 pm after blocking two way vehicular movement. Three machines were used in removing debris from the road. —

Two-way traffic resumes on Narayangadh–Muglin road

August 22, 2023
1 MIN READ
A
A+
A-

Two-way vehicular traffic has resumed on Narayangadh-Muglin road, said Information Officer at Road Division, engineer Chandeshwor Saha.

Vehicular movement on this roadway was obstructed due to the landslip occurred at Namsikhola of Ichchhakamana Rural Municipality- 6 at 8:00pm Monday.

The vehicles that were stranded due to the road blockade have headed towards their respective destinations. The Narayangadh-Muglin section of the road is obstructed frequently due to landslides.