Saturday Apr 20, 2024
Saturday Apr 20, 2024

Beni-Jomsom road

Bailey bridge installed over Bhurung rivulet in two weeks

Jul 5, 2023
A bailey bridge has been constructed over the Bhurung rivulet along the Beni-Jomsom road.

Beni-Jomsom national highway obstructed

Jun 14, 2023
The Beni-Jomsom road that connects the Mustang district with the national highway through the northern area has been obstructed.

One dies after slipping from the Rupse waterfalls

May 6, 2023
One person died today after slipping while observing the Rupse waterfall in Annapurna rural municipality-3.

Beni-Jomsom road to remain closed for six hours a day

Mar 16, 2023
Beni-Jomsom road that connects Mustang to the national highway is to remain closed for six hours a day.

NPC directs feasibility study for tunnel construction in Myagdi

Mar 2, 2022
The National Planning Commission (NPC) has directed the authorities concerned to undertake a feasibility study on tunnel construction on Myagdi section of the Beni-Jomsom road.

Multiple bridges being built rapidly in Beni-Jomsom section

Feb 12, 2022
Construction of motorable bridges on Kaligandaki River and its tributaries has started on Beni-Jomsom-Korla road section.

Beni-Jomsom road reopened after six days

Aug 8, 2021
The Beni-Jomsom road has come into operation after six days.

Beni-Jomsom highway to resume after two days

Mar 30, 2021
Beni-Jomsom road that connects Mustang district to the national road network is likely to remain closed for two more days.
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

KMC-02, UttarDhoka,
Lazimpat, Nepal

Newsroom
+977–01–4445751 / 4445754

E-mail
[email protected] [email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal