Thursday May 26, 2022
Thursday May 26, 2022

Marsyangdi River

Top destination to travel this 2079: Bandipur

Apr 19, 2022
Resting beautifully on the hilltop at an elevation of 1030 meters (3379.265 ft) above Marsyangdi River Valley.

Suspension bridge over Marsyangdi River subsides due to flood

Jul 3, 2021
A suspension bridge over the Marsyangdi River has subsided in Narpabhumi Rural Municipality-2 in Manang district.

Efforts continue to bring Marsyangdi River to natural course

Jun 29, 2021
Efforts are made to remove stone, wood and sand deposited at the motorable bridge over the Marsyangdi River.

Uncertainty looms over future of Manang students

Jun 26, 2021
Floods triggered by endless rains in Manang have largely damaged schools, leaving students, teachers and guardians in distress

China-Nepal joint venture gets nod to develop hydropower projects

Jun 24, 2021
China-Nepal joint venture to develop three separate hydropower projects simultaneously on the Marsyangdi river in western Manang and Lamjung districts.

Marsyangdi River gets blocked in Chame, Manang

Jun 23, 2021
Chief District Officer Bishnu Lamichhane said the river blockage created by soil erosion and other objects including wooden logs

Water starts flowing in Marshyangdi River

Jun 21, 2021
Water has started flowing again in Marshyangdi River after it was blocked due to the debris collected in the river because of the floods and landslides.

Landslide blocks Marsyangdi River, poses risk to settlement in Manang

Jun 19, 2021
The flow of the Marsyangdi River has been disrupted after landslide debris fell into the river along the border of Chame Rural Municipality-4 and 5.
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

KMC-02, UttarDhoka,
Lazimpat, Nepal

Newsroom
+977–01–4445751 / 4445754

E-mail
[email protected] [email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal