Saturday Apr 20, 2024
Saturday Apr 20, 2024

Nagdhunga-Naubise road section in operation


Nepalnews
2021 Aug 30, 13:01, Kathmandu
Vehicles and equipment are seen at the site of under-construction Nagdhunga tunnel, on Friday, February 12, 2021. The tunnel road has been expected to ease the traffic congestion seen along the Naubise-Nagdhunga section of the highway.

The Nagdhunga-Naubise road section, which was blocked due to landslides after incessant rains, has come into operation. The Nagdhunga-Naubise road section, which was blocked at 5.30 this morning due to a landslide near Chisapani, Dharan on Tribhuvan Highway, has been operational for some time now.

Chief of the Metropolitan Police Circle, Thankot, Deputy Superintendent of Police Mohan Khan informed that the road was brought into operation after six hours.

After the landslide in Chandragiri Municipality-2, Chisapani, vehicles entering and leaving the capital through Nagdhunga have been queuing. Due to the landslide, there was hug traffic jam in Thankot towards Kathmandu and in Khanikhola towards Dhading. The highway has been repeatedly blocked due to landslides while widening the highway near Sisnekhola where the tunnel is being constructed.

READ ALSO:

Nagdhunga-Naubise Road Section Landslides Tribhuvan Highway
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

KMC-02, UttarDhoka,
Lazimpat, Nepal

Newsroom
+977–01–4445751 / 4445754

E-mail
[email protected] [email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal