The vehicular operation has been permitted on the Abukhaireni-Muglin road section along the Prithvi Highway in Tanahun at night as well.
Vehicular movement was completely closed from 7.00 pm to 5.00 pm since last Friday after the road near the powerhouse at Anbukhaireni Rural Municipality-4 was washed away due to heavy rain.
Two-way traffic along the road section has been open since Sunday. The District Administration Office, Tanahun had banned the operation of vehicles during the stated time on Friday and Saturday considering the increased risk of travel at night.
Assistant Chief District Officer Kashiram Gaire shared that the operation of light and heavy vehicles was allowed since Sunday evening after the maintenance of the damaged road section.
The Road Division Office, Damauli had cut down a wall nearby the collapsed section of the road. Until complete road maintenance, the only one-way vehicular operation has been allowed along the damaged road section.
However, the vehicular movement would remain closed on Yampafant and Ghansikuwa road stretches from 11.00 pm to 4.00 am for the construction of the Muglin-Pokhara road section as per the previous notice.
READ ALSO: